The installer measures each room, calculates heat loss, and chooses head sizes and locations, then drills a small opening for each line set, mounts the outdoor unit, and runs refrigerant lines, wiring, and a condensate drain. A single-zone job is often finished in a day; larger multi-zone systems take longer.
The electrical connection usually needs a permit through Wareham's Inspectional Services Department, which accepts applications online only and mails permits to the applicant. The permit card has to be on site when the electrical inspector comes, or the inspector leaves and a re-inspection fee follows.
In a seasonal cottage, ask how the system should be set when the house is closed and whether a mini-split alone can protect pipes over the winter, or whether another heat source should stay in service.