In new construction, the installer usually works in two visits: a rough-in while walls are open, to run line sets, condensate tubing, and wiring, and a finish visit after paint to hang the head and start the system. That keeps the visible parts clean and the lines hidden.
In a basement, expect a closer look at the foundation wall where the line set exits, at the sill, and at grade outside. The penetration should be sealed against water and pests, and the outdoor unit should sit high enough to avoid splashback and snow. The new circuit is permitted through PermitEyes and inspected before final.
When it's done, ask the installer to set the head for the room's actual use, such as a gentle dry setting for a basement in July, and to show you the filter and the pump's overflow switch.